REAL at CoreNetOct 26–28

Meet Us
Construction / Design QA/QC

Catch the design gap before it reaches the issued set.

REAL checks drawings and BIM against the standards, lease terms, and specifications that govern the project, surfacing what is missing, inconsistent or changed before it becomes a construction issue.

Get a dedicated demo
Apply senior design judgment across every project.
Today, 12:45 PMconstruction

REAL structures the checks experienced teams already perform, including client standards, work-letter requirements, MEP and accessibility, and applies them consistently across every project. Required professional sign-off stays with the architect, engineer, or authority having jurisdiction.

Checks applied · Northgate build

Client design standards

Checked against plans and specifications

Lease & work-letter requirements

Tested against landlord and tenant obligations

MEP requirements

Cross-checked across drawings and schedules

Accessibility requirements

Pre-screened against defined requirements

Sustainability requirements

LEED / WELL criteria where configured

Project-specific specifications

Checked against the governing project package

Expert review becomes repeatable across every project, and missing requirements surface while the team can still fix them.

  • Senior architects and engineers review drawings, models and standards project by project, and the quality depends on who remembers what to check
  • REAL turns those expert checks into repeatable logic, applied across the design package, with every exception tied to the source that triggered it
01

Apply senior design judgment across every project.

REAL structures the checks experienced teams already perform, including client standards, work-letter requirements, MEP and accessibility, and applies them consistently across every project. Required professional sign-off stays with the architect, engineer, or authority having jurisdiction.

Checks applied · Northgate build

Client design standards

Checked against plans and specifications

Lease & work-letter requirements

Tested against landlord and tenant obligations

MEP requirements

Cross-checked across drawings and schedules

Accessibility requirements

Pre-screened against defined requirements

Sustainability requirements

LEED / WELL criteria where configured

Project-specific specifications

Checked against the governing project package

02

Catch what disappeared between the model and the deliverable.

Information can exist correctly in the model and still fail to appear in the issued set. REAL compares BIM, drawings, schedules and prior revisions to surface what went missing or changed between versions, with every finding linked back to its source.

Model-to-drawing check · Northgate build

Storefront clear opening

Current drawing

Annotation missing

Flagged

BIM / model data

Requirement present

Confirmed

Client design standard

Clear opening minimum

Referenced

Previous revision

v6 included annotation

Compared

Requirement present in the model but missing from the issued drawing. Returned for review before issue.

03

Five steps from governing requirement to resolved exception.

REAL loads the governing requirements, reads the current design package, runs the expert checks, compares versions and sources, and moves every exception forward with its evidence attached.

Architect reviewing marked-up drawing sets at a project table
04

Not another drawing viewer. The check includes why the design matters.

REAL tests the design against context outside the file itself, including standards, lease terms, work letters, and project history. It's not just that two files differ. REAL identifies where the difference conflicts with what the project is supposed to deliver, and carries that exception into action.

Generic drawing comparison vs. REAL

Generic toolREAL

Flags that two files differ

Flags why the difference matters

Reads the drawing file

Also reads standards, leases, work letters, and specs

Stops at detection

Carries the exception into action

One agent is powerful.
A suite is transformative.

Each REAL agent is an expert in its domain, built to share context and act on what the others know. The more agents work in your portfolio, the more complete each one’s view of it becomes, and the stronger every decision your team makes.

FacilitiesRight issue. Right owner. Right action.Connect asset condition, service history, contracts, work orders and site context to prevent failures and route the work that needs attention.Explore Facilities
ConstructionCatch the gap before it becomes cost.Connect drawings, standards, estimates, bids, scope, contracts and project history from first plan through final cost.Explore Construction
Portfolio StrategyRun the portfolio decision across every location.Combine economics, leases, physical feasibility, operations, market context and external constraints to rank what to do next.Explore Portfolio Strategy
Lease AccountingFrom ASC 842 to every lease-related payment.Maintain lease accounting, validate CAM and rent changes, control payments and trace every calculation back to the governing source.Explore Lease Accounting
Lease AdministrationTurn every lease term into action.Keep rights, obligations, dates, notices and recoveries current across the full lease portfolio, with the governing clause attached to every action.Explore Lease Administration

FAQ

Initial agents live in two weeks.

Start with one or two high-value workflows, connect the required data and documents, measure the result, then expand across domains.

  • A tailored onboarding for every enterprise.
  • Fitted to how you actually work.
  • Continuous support as your portfolio evolves.