Construction / Design QA/QC

Catch the design gap before it reaches the issued set.

REAL checks drawings and BIM against the standards, lease terms, and specifications that govern the project, surfacing what is missing, inconsistent or changed before it becomes a construction issue.

Why it matters

Expert review becomes repeatable across every project, and missing requirements surface while the team can still fix them.

Senior architects and engineers review drawings, models and standards project by project, and the quality depends on who remembers what to check. REAL turns those expert checks into repeatable logic, applied across the design package, with every exception tied to the source that triggered it.

1M+

construction and as-built documents put to work within days

01

Apply senior design judgment across every project.

REAL structures the checks experienced teams already perform, including client standards, work-letter requirements, MEP and accessibility, and applies them consistently across every project. Required professional sign-off stays with the architect, engineer, or authority having jurisdiction.

Checks applied · Northgate build

Client design standards

Checked against plans and specifications

Lease & work-letter requirements

Tested against landlord and tenant obligations

MEP requirements

Cross-checked across drawings and schedules

Accessibility requirements

Pre-screened against defined requirements

Sustainability requirements

LEED / WELL criteria where configured

Project-specific specifications

Checked against the governing project package

02

Catch what disappeared between the model and the deliverable.

Information can exist correctly in the model and still fail to appear in the issued set. REAL compares BIM, drawings, schedules and prior revisions to surface what went missing or changed between versions, with every finding linked back to its source.

Model-to-drawing check · Northgate build

Storefront clear opening

Current drawing

Annotation missing

Flagged

BIM / model data

Requirement present

Confirmed

Client design standard

Clear opening minimum

Referenced

Previous revision

v6 included annotation

Compared

Requirement present in the model but missing from the issued drawing. Returned for review before issue.

03

Five steps from governing requirement to resolved exception.

REAL loads the governing requirements, reads the current design package, runs the expert checks, compares versions and sources, and moves every exception forward with its evidence attached.

Workflow

01 · Define what the project must satisfy

Client standards, lease and work-letter requirements, specifications

02 · Read the current design package

BIM, drawings, schedules, specifications, revisions

03 · Run the expert checks

Omissions, inconsistencies, conflicts, changed requirements

04 · Compare versions and sources

What changed, and where sources no longer agree

05 · Move the exception forward

Evidence, affected requirement, and required review attached

04

Not another drawing viewer. The check includes why the design matters.

REAL tests the design against context outside the file itself, including standards, lease terms, work letters, and project history. It's not just that two files differ. REAL identifies where the difference conflicts with what the project is supposed to deliver, and carries that exception into action.

Generic drawing comparison vs. REAL

Generic toolREAL

Flags that two files differ

Flags why the difference matters

Reads the drawing file

Also reads standards, leases, work letters, and specs

Stops at detection

Carries the exception into action

Go deeper

Purpose-built for every part of the workflow.

Every workflow, one context

Every workflow gets the full real estate context.

Lease, financial, construction, facilities, and portfolio workflows run on the same asset or location context. What one workflow learns becomes usable by the next, without rebuilding the evidence every time.

Catch the design gap while it still costs nothing to fix.

Bring one project package. See REAL check it against the standards, leases and specifications that govern it.

  • Client standards, leases, and work letters checked automatically
  • BIM and issued drawings compared for what disappeared
  • Every exception tied to its source evidence

Design QA/QC

Frequently asked questions

  • REAL checks the design package against the requirements configured for the project, including client standards, lease and work-letter requirements, specifications, MEP and accessibility criteria.

  • No. REAL makes repeatable checks and evidence discovery scalable. Professional review, engineering judgment, and formal sign-off remain with the appropriate professionals.

  • Where model and drawing information is available, REAL compares sources to surface missing, inconsistent or changed information, with every finding tied to its evidence.

  • Yes. This is a primary use case. Enterprise-specific standards become repeatable checks instead of requiring senior staff to repeat the same review on every project.

  • CAD / Plan Intelligence helps teams understand the information in plans. Design QA/QC tests those plans against what the project is supposed to contain and surfaces the exceptions that need action.

  • REAL supports pre-screening against defined requirements supplied to the workflow. It does not provide formal code approval or certification, or replace a licensed professional.

Book a Demo