Connect applicable codes, regulations and permit requirements to the drawings, specifications and site conditions they affect so missing requirements and permit dependencies surface before they block the project.
Get a dedicated demoREAL combines the jurisdiction, project type and site conditions to identify the requirements that apply, then links each one to the design element it affects.
Requirement mapping
Jurisdiction
Local code and amendments
Project type
Occupancy and use classification
Site condition
Zoning, utilities, existing structure
Applicable requirement
Affected design element
The requirements that apply depend on the jurisdiction, the project type and the conditions on the site. REAL connects those requirements to the design elements they affect, so the team sees what this project actually has to satisfy.
The requirements that apply depend on the jurisdiction, the project type and the conditions on the site. REAL connects those requirements to the design elements they affect, so the team sees what this project actually has to satisfy.
REAL combines the jurisdiction, project type and site conditions to identify the requirements that apply, then links each one to the design element it affects.
Requirement mapping
Jurisdiction
Local code and amendments
Project type
Occupancy and use classification
Site condition
Zoning, utilities, existing structure
Applicable requirement
Affected design element
Each requirement carries its status, the scope it affects, the decision it needs and the permit it depends on, so schedule exposure is visible while there is still time to act.
Permit dependency · Eastgate build
Requirement
Grease interceptor sizing
Status
Affected scope
Plumbing, kitchen layout
Decision needed
Interceptor location and capacity
Permit dependency
Plumbing permit
Schedule exposure
When the design does not yet show what a requirement needs, REAL flags the gap and links the requirement source and the project evidence, so the reviewer starts from the facts.
Gap record
Requirement source
Applicable code section, as supplied
Project evidence
Sheet P-101, specification 22 13 00
Gap
Required element not shown
A requirement that changes the design also changes the scope, the cost and the schedule. REAL carries that impact forward so it reaches the estimate and the plan.
Impact chain
Requirement
Design / scope impact
Cost impact
Schedule impact
REAL supports code, permit and regulatory review by structuring requirements, comparing them with project evidence and surfacing issues that need attention. Final interpretation, professional determination, design approval and regulatory authority remain with the appropriate licensed professionals and authorities having jurisdiction.
Who does what
Structures the requirements
Compares them with project evidence
Surfaces issues that need attention
9 agents
REAL connects drawings, specifications, standards, estimates, bids, contracts, revisions and project history so construction teams can plan, price and control the work from first design through final cost.
Five ways REAL puts the portfolio to work
Each REAL agent is an expert in its domain, built to share context and act on what the others know. The more agents work in your portfolio, the more complete each one’s view of it becomes, and the stronger every decision your team makes.
Start with one or two high-value workflows, connect the required data and documents, measure the result, then expand across domains.