Construction / Permit, Code & Regulatory Review

Know what's required before it becomes a delay.

Connect applicable codes, regulations and permit requirements to the drawings, specifications and site conditions they affect so missing requirements and permit dependencies surface before they block the project.

Get a dedicated demo
Map each requirement to the design.
Today, 12:45 PMconstruction

REAL combines the jurisdiction, project type and site conditions to identify the requirements that apply, then links each one to the design element it affects.

Requirement mapping

Jurisdiction

Local code and amendments

Project type

Occupancy and use classification

Site condition

Zoning, utilities, existing structure

Applicable requirement

Identified

Affected design element

Linked

A generic checklist cannot tell you what this project needs.

The requirements that apply depend on the jurisdiction, the project type and the conditions on the site. REAL connects those requirements to the design elements they affect, so the team sees what this project actually has to satisfy.

  • For finance, accounting, and controllership teams
  • Trained on decades of enterprise facilities expertise
  • Built for the realities of physical operations at scale
01

Map each requirement to the design.

REAL combines the jurisdiction, project type and site conditions to identify the requirements that apply, then links each one to the design element it affects.

Requirement mapping

Jurisdiction

Local code and amendments

Project type

Occupancy and use classification

Site condition

Zoning, utilities, existing structure

Applicable requirement

Identified

Affected design element

Linked
02

Find permit dependencies before they become schedule dependencies.

Each requirement carries its status, the scope it affects, the decision it needs and the permit it depends on, so schedule exposure is visible while there is still time to act.

Permit dependency · Eastgate build

Requirement

Grease interceptor sizing

Status

Needs decision

Affected scope

Plumbing, kitchen layout

Decision needed

Interceptor location and capacity

Permit dependency

Plumbing permit

Schedule exposure

High
03

Flag the gap with the source attached.

When the design does not yet show what a requirement needs, REAL flags the gap and links the requirement source and the project evidence, so the reviewer starts from the facts.

Gap record

Requirement source

Applicable code section, as supplied

Project evidence

Sheet P-101, specification 22 13 00

Gap

Required element not shown

Flagged
04

Connect the requirement to cost and time.

A requirement that changes the design also changes the scope, the cost and the schedule. REAL carries that impact forward so it reaches the estimate and the plan.

Impact chain

Requirement

Design / scope impact

Cost impact

Schedule impact

05

Professional review stays with the professional.

REAL supports code, permit and regulatory review by structuring requirements, comparing them with project evidence and surfacing issues that need attention. Final interpretation, professional determination, design approval and regulatory authority remain with the appropriate licensed professionals and authorities having jurisdiction.

Who does what

REALLicensed professionals & AHJ

Structures the requirements

Interpret the requirement

Compares them with project evidence

Make the professional determination

Surfaces issues that need attention

Approve the design and issue the permit

Five ways REAL puts the portfolio to work

One agent is powerful.
A suite redefines possibilities.

Each REAL agent is an expert in its domain, built to share context and act on what the others know. The more agents work in your portfolio, the more complete each one’s view of it becomes, and the stronger every decision your team makes.

FacilitiesRight issue. Right owner. Right action.Connect asset condition, service history, contracts, work orders and site context to prevent failures and route the work that needs attention.Explore Facilities
ConstructionCatch the gap before it becomes cost.Connect drawings, standards, estimates, bids, scope, contracts and project history from first plan through final cost.Explore Construction
Portfolio StrategyRun the portfolio decision across every location.Combine economics, leases, physical feasibility, operations, market context and external constraints to rank what to do next.Explore Portfolio Strategy
Lease AccountingFrom ASC 842 to every lease-related payment.Maintain lease accounting, validate CAM and rent changes, control payments and trace every calculation back to the governing source.Explore Lease Accounting
Lease AdministrationTurn every lease term into action.Keep rights, obligations, dates, notices and recoveries current across the full lease portfolio, with the governing clause attached to every action.Explore Lease Administration

Initial agents live in two weeks.

Start with one or two high-value workflows, connect the required data and documents, measure the result, then expand across domains.

  • A tailored onboarding for every enterprise.
  • Fitted to how you actually work.
  • Continuous support as your portfolio evolves.