For construction, capital projects, and project management teams

Find the missing scope before it becomes a change order.

Every drawing set read against every contract, so the gaps surface while they still cost nothing.

Why it matters

An AI construction expert that reads every drawing and contract, names every scope gap, and verifies every change order against what was agreed.

A change order is usually a gap that was visible in the documents before anyone broke ground.

1.2B

sqft of enterprise operations run on REAL

8M+

tasks completed across enterprise portfolios

14%

average cost reduction across portfolio

01 · Scope gap detection

Find the gaps while they still cost nothing.

Work that appears on a drawing but in no contract, and exclusions buried in bid qualifications. REAL reads both sides and names what nobody has agreed to do.

Scope reviewNashville remodel

Demolition

GAPin no bid

Permit fees

GAPexcluded · Contractor C

Fire alarm tie-in

no contract covers it

GAPunassigned
Estimated exposure$34,000
02 · Execution against plan

Catch the deviation at rough-in, not at punch list.

Work is checked against the approved drawing while it is still accessible. A deviation found at rough-in is a conversation. The same deviation found at punch list is a change order.

Execution checkNashville · rough-in

Approved plan

v9 · Sheet E-201

Panel location

OKas drawn

Circuit count

DEVIATION18 planned · 16 installed
Flagged at rough-inbefore closeout
03 · Change order verification

Verify every change order against what was already agreed.

A change order for work the contract already covers is not a change. Each one is checked against the executed scope and the approved drawing before it reaches an approver.

Change order 07Nashville remodel

Claimed

added electrical capacity

$28,400

Contract scope

includes panel upgrade

§3.2

Assessment

DISPUTEwithin original scope
Recommended$0
04 · Bid set to as-built

Reconcile what was built against what was bid.

Closeout is where undocumented changes surface. Comparing the bid set to the as-built shows what changed, whether a change order covered it, and whether it was paid for twice.

Bid set to as-builtMichigan Ave Chicago

Restroom fixtures planned

6

As-built

+2

8

Change order on record

FLAGnone
Undocumented variancefound at closeout

The same gap tends to recur across a rollout.

Nine of thirty-four projects with the same fire alarm tie-in gap is not nine accidents. Patterns across the portfolio become checks on the next bid package instead of a surprise on the next invoice.

05 · Shared context

Close the loop from change order to asset record.

Work that changes the building changes the asset register. An approved change order updates the equipment record and its warranty start without a separate handoff.

SCOPE & CHANGE ORDERS AGENT ⇄ FACILITIES AGENT
Downstreamverified scope · installed assets · equipment
Upstreamasset condition · warranty status
Live Context Updateauto

CO 07 approved · rooftop unit replaced → Facilities

Asset record and warranty start updated

The REAL Suite

One agent is powerful. A suite is transformative.

Each REAL agent is an expert in its domain, built to share context and act on what the others know. The more agents work in your portfolio, the more complete each one’s view of it becomes, and the stronger every decision your team makes.

Scope & Change Orders

Frequently asked questions

  • Most change orders trace back to something already visible in the documents: scope on a drawing that no contract covers, or an exclusion buried in a bid qualification. REAL reads the drawing set against every contract and names the gaps while they are still free to fix, then checks execution against the approved plan during the build rather than at closeout.

  • Work that needs doing but that no party has contracted to do. It arises when a drawing shows something no bid priced, when each bidder assumed another trade would handle it, or when an exclusion in a bid qualification was never reassigned. It surfaces later as a change order at a worse price.

  • At the inspection stage where it is still accessible, which usually means underground or rough-in rather than punch list. Installed work is checked against the approved drawing version, so a circuit count or a panel location that differs from the plan is raised while correcting it is still cheap.

  • Against the executed contract scope and the approved drawing set. A change order claiming work the contract already covers is flagged with the clause that covers it. One reflecting genuine new scope is confirmed as such, with supporting references attached.

  • Yes, and closeout is where that comparison earns its keep. Differences between what was bid and what was built are surfaced along with whether a change order covered them, which catches both unbilled work and work paid for twice.

  • That is where it is strongest. The same omission recurs across a programme, so recurring patterns across the portfolio become checks on the next bid package rather than a repeated surprise.

  • REAL runs in a single tenant on your data, SOC 2 Type II and ISO 27001 certified, and your data is never used to train any model.

Catch the gap before the invoice arrives.

See REAL read one of your own drawing sets against its contracts.

  • Gaps found before award
  • Deviations caught at rough-in
  • Every change order verified
Book a Demo