Construction / Prototype & Standards Compliance

Build to standard. Catch deviations before they reach the field.

Compare drawings, specifications and project requirements against approved prototypes and company standards to find deviations, missing requirements and conflicts while they are still cheap to correct.

Get a dedicated demo
Check every project against the approved standard.
Today, 12:45 PMconstruction

REAL structures the approved prototype and company standards into checks that run against every project package, so the same requirement is applied the same way at every location.

Standard checks · Prototype v4

Storefront configuration

Material specification

Equipment requirement

Fixture layout

Clear dimension

Back-of-house standard

Signage requirement

Company accessibility standard

A standard only works when every project is checked against it.

Prototype requirements live across drawings, specifications, schedules and company standards. REAL turns the approved standard into repeatable project checks.

  • For finance, accounting, and controllership teams
  • Trained on decades of enterprise facilities expertise
  • Built for the realities of physical operations at scale
01

Check every project against the approved standard.

REAL structures the approved prototype and company standards into checks that run against every project package, so the same requirement is applied the same way at every location.

Standard checks · Prototype v4

Storefront configuration

Material specification

Equipment requirement

Fixture layout

Clear dimension

Back-of-house standard

Signage requirement

Company accessibility standard

02

Read the documents together.

A requirement can be right on the drawing and wrong in the specification or schedule. REAL reads the company standard, drawings, specifications and schedules together and checks each requirement across all of them.

Requirement check

Company standard

Approved prototype requirement

Drawing

Current issued set

Specification

Project specification sections

Schedule

Equipment and finish schedules

Requirement check

Run

Exception

Flagged
03

Keep the standard active through every revision.

Every new revision is checked against the same standard, so a deviation introduced late in the design is caught before it is issued, not discovered in the field.

Revision history · Riverside build

Rev 3

All standard checks passed

Compliant

Rev 4

Fixture layout changed

Deviation

Rev 5

Deviation resolved

Compliant
04

Every deviation carries the evidence behind it.

Each exception names the affected requirement and links to the source evidence, so the reviewer can confirm or resolve it without re-reading the package.

Deviation record

Deviation

Clear dimension below standard

Affected requirement

Company standard 4.2 · aisle clearance

Source evidence

Sheet A-201, specification 06 40 00

Required review

Design lead sign-off

Open
05

Run the same standard across the rollout.

For multi-site programs, REAL applies one standard to every location in the rollout and shows where each project stands, so consistency does not depend on who reviewed which package.

Rollout status

Location 014

Compliant

Location 022

2 deviations

Location 031

Compliant

Location 047

In review

Five ways REAL puts the portfolio to work

One agent is powerful.
A suite redefines possibilities.

Each REAL agent is an expert in its domain, built to share context and act on what the others know. The more agents work in your portfolio, the more complete each one’s view of it becomes, and the stronger every decision your team makes.

FacilitiesRight issue. Right owner. Right action.Connect asset condition, service history, contracts, work orders and site context to prevent failures and route the work that needs attention.Explore Facilities
ConstructionCatch the gap before it becomes cost.Connect drawings, standards, estimates, bids, scope, contracts and project history from first plan through final cost.Explore Construction
Portfolio StrategyRun the portfolio decision across every location.Combine economics, leases, physical feasibility, operations, market context and external constraints to rank what to do next.Explore Portfolio Strategy
Lease AccountingFrom ASC 842 to every lease-related payment.Maintain lease accounting, validate CAM and rent changes, control payments and trace every calculation back to the governing source.Explore Lease Accounting
Lease AdministrationTurn every lease term into action.Keep rights, obligations, dates, notices and recoveries current across the full lease portfolio, with the governing clause attached to every action.Explore Lease Administration

Initial agents live in two weeks.

Start with one or two high-value workflows, connect the required data and documents, measure the result, then expand across domains.

  • A tailored onboarding for every enterprise.
  • Fitted to how you actually work.
  • Continuous support as your portfolio evolves.